Please use this identifier to cite or link to this item: http://bibliotecavirtual.dgb.umich.mx:8083/xmlui/handle/DGB_UMICH/16116
Title: Modernización de tableros y equipo eléctrico de la Planta Carlos Fonseca
Authors: Farfán Madrigal, Fernando Obet
Adviser: Franco Torres, Ignacio
Keywords: info:eu-repo/classification/cti/7
FIE-L-2017-1670
Reporte de experiencia profesional
Casa de máquinas
Disposición de equipos
Bandeja de cable
Issue Date: Oct-2017
Publisher: Universidad Michoacana de San Nicolás de Hidalgo
Abstract: This work presents part of my work experience, in which I show the experience in designing routes for the cable trays, as well as the selection of the same depending on the amount of cables that will take. Also in this work I talk about the identification of each board using the KKS system, the layout of the equipment, the equipment feeder as well as its branch circuits. And the importance of using AutoCAD for an electrician engineer.
Este trabajo presenta parte de mi experiencia laboral, en el que muestro la experiencia en diseño de rutas para las canalizaciones, así como la selección de la misma dependiendo la cantidad de cables que llevara. También en este trabajo hablo sobre la identificación de cada tablero mediante el sistema KKS, la disposición del equipo, el alimentador del equipo, así como sus derivaciones. Y la importancia del uso de AutoCAD para un ingeniero electricista.
Description: Facultad de Ingeniería Eléctrica. Licenciatura como Ingeniero Electricista
URI: http://bibliotecavirtual.dgb.umich.mx:8083/xmlui/handle/DGB_UMICH/16116
Appears in Collections:Licenciatura

Files in This Item:
File Description SizeFormat 
FIE-L-2017-1670.pdf3.32 MBAdobe PDFThumbnail
View/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.